Hever Station Emergency Cutting Works

CK Rail safely completed over 6,500 hours of emergency work to repair and strengthen a railway cutting at Hever station in Kent. Engineers were onsite within two hours of reports a landslip had occurred south of platform 1 at the station on the Uckfield branch of the Oxted line. An initial incident survey and report […]

Case study image

Wivelsfield Emergency Embankment Works

CK Rail successfully completed emergency embankment work on the Brighton Main Line following a landslip at Wivelsfield, East Sussex. This section of railway track was being closely monitored by Network Rail after England recorded its fifth wettest autumn on record, with seven months’ worth of rain falling between October and December 2019. CK Rail reacted […]

Case study image

Edenbridge Emergency Embankment Works

Collaborative working was key to the success of emergency earthworks completed by CK Rail along the railway line in Kent. Following a 30metre landslip on a section of the railway embankment between Edenbridge Town and Hurst Green stations, CK Rail were tasked with carrying out this essential work to safeguard the railway. A spell of […]